CLINKER FACILITIES

Client : PT Semen Gresik
Location : Tuban - Indonesia
Period : 2012
Outline of Project

Fondation, Structural Concrete, Steel Erection and Architectural Clinker Facilities.

Scope of Work

Engineering, Procurement

Landscape, mountains

COMBINED CYCLE POWER PLANT (CAPACITY 120 MW)/ OWNER SCOPE PROYEK COMBINED CYCLE POWER PLANT (CAPACITY 120 MW)

Client : PT KRAKATAU DAYA LISTRIK
Period : 2012
Outline of Project

Build a New 120MW Combined Cycle Power Plant

Scope of Work

Procurement and Construction

Landscape, mountains

NEW GATHERING STATION AT NIRU STRUCTURE

Client : PT. Pertamina EP
Location : Niru - South Sumatra
Period : 2011
Outline of Project

Construction the niru gathering station facility to handle oil production from 27 well and 2 injection wells at niru area. The capacity of each well is predicted around 850 BFPD, total fluida is amount 23.000 BFPD

Scope of Work

Procurement and Construction

Landscape, mountains

ZERO REFORMER DIRECT REDUCTION OF IRON ORE PLANT

Client : PT Krakatau Steel
Location : Cilegon, Banten - Indonesia
Period : 2011
Outline of Project

- Revitalization of HYL III Zero reformer - T o increase Capacity From 5.000 TPD to 5.800 TPD - Reduce Maintenance Cost (with out Reformer) - Operatable with Low Pressure of Natural Gas

Scope of Work

Engineering, Procurement, Construction

Landscape, mountains

BARGE LOADING FACILITY EXTENSION KPC

Client : PT Kaltim Prima Coal
Location : Sangata, East Kalimantan
Period : 2011
Scope of Work

Engineering, Procurement and Construction

Landscape, mountains

CRUDE PALM OIL PLANT

Client : PTPN III
Location : Hapesong, South T apanuli - North Sumatra
Period : 2011
Outline of Project

CPO Plant 30 ton/hour

Scope of Work

Engineering, Procurement and Construction

Landscape, mountains

CONSTRUCTION OF JETT Y FOR CONTINOUS BARGER UNLOADER AT NORTH COAL TERMINAL

Client : PT Nusa T ambang Pratama
Location : Pulau Laut, Kotabaru - South Kalimantan
Period : 2011
Outline of Project

Capacity Enhacement of Jetty and Conveyor for Coal Handling Services

Scope of Work

Engineering, Procurement and Construction

Landscape, mountains

ASAM-ASAM CPP AND OLC PROJECT

Client : PT Nusa Tambang Pratama
Location : Kalimantan Selatan - Indonesia
Period : 2011
Outline of Project

Capacity Enchancement of Coal Conveyor & Jetty Handling

Scope of Work

Engineering, Procurement, Construction

Landscape, mountains

LUBRICANT OIL PRODUCTION UPGRADING PROJECT

Client : PT Pertamina (Persero) Jakarta
Location : Jakarta
Period : 2011
Scope of Work

Procurement and Construction

Landscape, mountains

BULK TERMINAL CONSTRUCTION PROJECT

Client : PT Cigading International Bulk T erminal
Location : Cilegon, Banten - Indonesia
Period : 2011
Outline of Project

on an area of 12 hectare and is facilitated with sophisticated equipment, capable of accommodating as much coal 8jt tons / year . CIBT has current capacity out of 6 million tpy , it can even be increased up to 12 million tpy . 2000 tph of loading capacity , with 450,000 tons storage capacity of T erminal that has cranes facilities, conveyor , and warehouses, that use Programmable Logic Control Systems (PLC).

Scope of Work

Engineering, Procurement and Construction

Landscape, mountains

DIRECT REDUCTION ROTARY KILN PLANT

Client : PT Meratus Jaya Iron & Steel
Location : Kalimantan Selatan - Indonesia
Period : 2011
Outline of Project

New 315.000 tpy Direct Reduction Rotary Kiln Plant Building complete with main office, equipment and outdoor related facilities. Iron Making Plant with rotary Kiln T echnology 2x14MW . Power Plant

Scope of Work

Engineering, Proc urement, Construction and Commissioning

Landscape, mountains

PENINGKATAN KAPASITAS WADUK KRENCENG

Client : PT KRAKATAU TIRTA INDUSTRI (PT KTI)
Location : CILEGON
Period : 2011
Outline of Project

Reservoir Enlargergement to Increase Water Capacity

Scope of Work

Engineering, Procurement and Construction

Landscape, mountains

BLAST FURNACE PT KRAKATAU STEEL

Client : PT KRAKATAU STEEL
Location : CILEGON
Period : 2011
Outline of Project

Establishment of New Blast Furnace Complex to produce 1,200,000 MT/Y of hot metal & pig iron

Scope of Work

EPC

Landscape, mountains

NTP 47-0034 BARGE LOADING FACILITY EXTENSION PROJECT

Client : PT NUSA TAMBANG PRATAMA
Location : SANGATTA-KALTIM
Period : 2011
Outline of Project

Barge Loading Conveyor System at Coal Mining

Scope of Work

EPC

Landscape, mountains

P5 COAL GRINDING MILL PROJECT

Client : PT Indocement T unggal Perkasa, Tbk
Location : Bogor , Jawa Barat - Indonesia
Period : 2010
Outline of Project

Civil & Mechanical Work Part #6

Scope of Work

Engineering, Procurement and Construction

Landscape, mountains

HIGH VOLTAGE TRANSMISSION LINE

Client : PT Perusahaan Listrik Negara (Persero)
Location : Rangkas, Banten - Indonesia
Period : 2010
Outline of Project

Upgrading SUTT 70 KV

Scope of Work

Procurement & Construction

Landscape, mountains

INCREASED FLEXIBILIT Y NPU

Client : PT Pertamina (Persero)
Location : Balongan, Jawa Barat - Indonesia
Period : 2010
Outline of Project

Addition of new stripper DI NPU 2, Addition of new tank (Naphta Processing Unit)

Scope of Work

Procurement and Construction

Landscape, mountains

CONSTRUCTION OF NAR 1 BLENDING SILO STRENGTHENING PROJECT

Client : PT . Holcim Indonesia, Tbk.
Location : Bogor , Jawa Barat - Indonesia
Period : 2010
Outline of Project

Silo Concrete Strengthening

Scope of Work

Engineering, Procurement and Construction

Landscape, mountains

CONSTRUCTION PT.KRAKATAU POSCO, INTEGRATED STEEL MILL

Client : Joint Venture KS - Posco
Location : Cilegon - Banten
Period : 2010
Outline of Project

Part Of Integrated Steel Mill 01. LAND CLEARING KS-POSCO
02. COKE OVEN PLANT & GAS TREATMENT PLANT OF INTEGRATION STELL MILL AT CILEGON
03. STEEL MAKING PLANT OF INTEGRATION STEEL MILL AT CILEGON
04. CONTINOUS CASTER PLANT OF INTEGRATED STEEL MILL AT CILEGON
05. PLATE MILL OF INTEGRATED STEEL MILL AT CILEGON
06. UPGRADING LUBRICANT PRODUCTION UNIT JAKARTA
07. ROAD DRAINAGE BASIC PLAN SERVICE OF INTEGRATED STEEL MILL
08. GAS SUPPLY FACILITY
09. POWER RECEIVING
10. PLATE MILL OF INTEGRATED STEEL MILL
11. STEEL MAKING PLANT OF INTEGRATED STEEL MILL
12. CONTINUOUS CASTER PLANT OF INTEGRATED STEEL MILL
13. COKE OVEN PLANT & GAS TREATMENT PLANT
14. BOREHOLE TEST OF INTEGRATED STEEL MILL
15. SITE OFFICE OF INTEGRATED STEEL MILL JV 16. SINTER PLANT OF INTEGRATED STEEL MILL
17. SINTER PLANT OF INTEGRATED STEEL MILL
18. BLAST FURNACE OF INTEGRATED STEEL MILL
19. BLAST FURNACE OF INTEGRATED STEEL MILL
20. PILE LOAD TEST OF INTEGRATED STEEL MILL
21. FINAL WASTE WATER TREATMENT & REUSING SYSTEM
22. FINAL WASTE TREATMENT & REUSING SYSTEM
23. SOFT SOIL IMPROVEMENT WORK OF INTEGRATED STEEL MILL KS POSCO
24. CIVIL & ARCHITECTURAL DESIGN ANDENGINEERING SERVICES
25. SLAG TREATMENT AND SLUDGE & DUST MIXING EQUIPMENT
26. SLAG TREATMENT AND SLUDGE & DUST MIXING EQUIPMENT
27. ANALYSIS LABORATORY FACILITY
28. PLATE MILL IF INTEGRATED STEEL MILL
29. CONTINUOUS CASTER PLANT OF INTEGRATED STEEL MILL
30. STEEL MAKING PLANT OF INTEGRATED STEEL MILL
31. COKE OVEN PLANT OF INTEGRATED STEEL MILL
32. CENTRAL MAINTENANCE HANDLING FACILITY

Scope of Work

EPC

Landscape, mountains

PEMBANGUNAN HOTEL 5 (LIMA) LANTAI HOTEL PERMATA KRAKATAU

Client : PT KRAKATAU INDUSTRIAL ESTATE CILECON (KIEC)
Location : Cilegon
Period : 2010
Outline of Project

New 4 Star hotel, 6159 m2 hotel building (5 floor) consist of 5 vip room, 29 double bed room, 45 twin bed room and other facilities includes grand lobby , 4 meeting room, restaurant.

Scope of Work

Engineering, Procurement & Construction for Structure, architecture, Mechanical, Electrical, Building Equipment, Interior , Furniture, Gardening and Landscaping