Project Experience
CLINKER FACILITIES
Client | : | PT Semen Gresik |
Location | : | Tuban - Indonesia |
Period | : | 2012 |
Outline of Project
Fondation, Structural Concrete, Steel Erection and Architectural Clinker Facilities.
Scope of Work
Engineering, Procurement
COMBINED CYCLE POWER PLANT (CAPACITY 120 MW)/ OWNER SCOPE PROYEK COMBINED CYCLE POWER PLANT (CAPACITY 120 MW)
Client | : | PT KRAKATAU DAYA LISTRIK |
Period | : | 2012 |
Outline of Project
Build a New 120MW Combined Cycle Power Plant
Scope of Work
Procurement and Construction
NEW GATHERING STATION AT NIRU STRUCTURE
Client | : | PT. Pertamina EP |
Location | : | Niru - South Sumatra |
Period | : | 2011 |
Outline of Project
Construction the niru gathering station facility to handle oil production from 27 well and 2 injection wells at niru area. The capacity of each well is predicted around 850 BFPD, total fluida is amount 23.000 BFPD
Scope of Work
Procurement and Construction
ZERO REFORMER DIRECT REDUCTION OF IRON ORE PLANT
Client | : | PT Krakatau Steel |
Location | : | Cilegon, Banten - Indonesia |
Period | : | 2011 |
Outline of Project
- Revitalization of HYL III Zero reformer - T o increase Capacity From 5.000 TPD to 5.800 TPD - Reduce Maintenance Cost (with out Reformer) - Operatable with Low Pressure of Natural Gas
Scope of Work
Engineering, Procurement, Construction
BARGE LOADING FACILITY EXTENSION KPC
Client | : | PT Kaltim Prima Coal |
Location | : | Sangata, East Kalimantan |
Period | : | 2011 |
Scope of Work
Engineering, Procurement and Construction
CRUDE PALM OIL PLANT
Client | : | PTPN III |
Location | : | Hapesong, South T apanuli - North Sumatra |
Period | : | 2011 |
Outline of Project
CPO Plant 30 ton/hour
Scope of Work
Engineering, Procurement and Construction
CONSTRUCTION OF JETT Y FOR CONTINOUS BARGER UNLOADER AT NORTH COAL TERMINAL
Client | : | PT Nusa T ambang Pratama |
Location | : | Pulau Laut, Kotabaru - South Kalimantan |
Period | : | 2011 |
Outline of Project
Capacity Enhacement of Jetty and Conveyor for Coal Handling Services
Scope of Work
Engineering, Procurement and Construction
ASAM-ASAM CPP AND OLC PROJECT
Client | : | PT Nusa Tambang Pratama |
Location | : | Kalimantan Selatan - Indonesia |
Period | : | 2011 |
Outline of Project
Capacity Enchancement of Coal Conveyor & Jetty Handling
Scope of Work
Engineering, Procurement, Construction
LUBRICANT OIL PRODUCTION UPGRADING PROJECT
Client | : | PT Pertamina (Persero) Jakarta |
Location | : | Jakarta |
Period | : | 2011 |
Scope of Work
Procurement and Construction
BULK TERMINAL CONSTRUCTION PROJECT
Client | : | PT Cigading International Bulk T erminal |
Location | : | Cilegon, Banten - Indonesia |
Period | : | 2011 |
Outline of Project
on an area of 12 hectare and is facilitated with sophisticated equipment, capable of accommodating as much coal 8jt tons / year . CIBT has current capacity out of 6 million tpy , it can even be increased up to 12 million tpy . 2000 tph of loading capacity , with 450,000 tons storage capacity of T erminal that has cranes facilities, conveyor , and warehouses, that use Programmable Logic Control Systems (PLC).
Scope of Work
Engineering, Procurement and Construction
DIRECT REDUCTION ROTARY KILN PLANT
Client | : | PT Meratus Jaya Iron & Steel |
Location | : | Kalimantan Selatan - Indonesia |
Period | : | 2011 |
Outline of Project
New 315.000 tpy Direct Reduction Rotary Kiln Plant Building complete with main office, equipment and outdoor related facilities. Iron Making Plant with rotary Kiln T echnology 2x14MW . Power Plant
Scope of Work
Engineering, Proc urement, Construction and Commissioning
PENINGKATAN KAPASITAS WADUK KRENCENG
Client | : | PT KRAKATAU TIRTA INDUSTRI (PT KTI) |
Location | : | CILEGON |
Period | : | 2011 |
Outline of Project
Reservoir Enlargergement to Increase Water Capacity
Scope of Work
Engineering, Procurement and Construction
BLAST FURNACE PT KRAKATAU STEEL
Client | : | PT KRAKATAU STEEL |
Location | : | CILEGON |
Period | : | 2011 |
Outline of Project
Establishment of New Blast Furnace Complex to produce 1,200,000 MT/Y of hot metal & pig iron
Scope of Work
EPC
NTP 47-0034 BARGE LOADING FACILITY EXTENSION PROJECT
Client | : | PT NUSA TAMBANG PRATAMA |
Location | : | SANGATTA-KALTIM |
Period | : | 2011 |
Outline of Project
Barge Loading Conveyor System at Coal Mining
Scope of Work
EPC
P5 COAL GRINDING MILL PROJECT
Client | : | PT Indocement T unggal Perkasa, Tbk |
Location | : | Bogor , Jawa Barat - Indonesia |
Period | : | 2010 |
Outline of Project
Civil & Mechanical Work Part #6
Scope of Work
Engineering, Procurement and Construction
HIGH VOLTAGE TRANSMISSION LINE
Client | : | PT Perusahaan Listrik Negara (Persero) |
Location | : | Rangkas, Banten - Indonesia |
Period | : | 2010 |
Outline of Project
Upgrading SUTT 70 KV
Scope of Work
Procurement & Construction
INCREASED FLEXIBILIT Y NPU
Client | : | PT Pertamina (Persero) |
Location | : | Balongan, Jawa Barat - Indonesia |
Period | : | 2010 |
Outline of Project
Addition of new stripper DI NPU 2, Addition of new tank (Naphta Processing Unit)
Scope of Work
Procurement and Construction
CONSTRUCTION OF NAR 1 BLENDING SILO STRENGTHENING PROJECT
Client | : | PT . Holcim Indonesia, Tbk. |
Location | : | Bogor , Jawa Barat - Indonesia |
Period | : | 2010 |
Outline of Project
Silo Concrete Strengthening
Scope of Work
Engineering, Procurement and Construction
CONSTRUCTION PT.KRAKATAU POSCO, INTEGRATED STEEL MILL
Client | : | Joint Venture KS - Posco |
Location | : | Cilegon - Banten |
Period | : | 2010 |
Outline of Project
Part Of Integrated Steel Mill
01. LAND CLEARING KS-POSCO
02. COKE OVEN PLANT & GAS TREATMENT PLANT OF INTEGRATION
STELL MILL AT CILEGON
03. STEEL MAKING PLANT OF INTEGRATION STEEL MILL AT CILEGON
04. CONTINOUS CASTER PLANT OF INTEGRATED STEEL MILL AT
CILEGON
05. PLATE MILL OF INTEGRATED STEEL MILL AT CILEGON
06. UPGRADING LUBRICANT PRODUCTION UNIT JAKARTA
07. ROAD DRAINAGE BASIC PLAN SERVICE OF INTEGRATED STEEL
MILL
08. GAS SUPPLY FACILITY
09. POWER RECEIVING
10. PLATE MILL OF INTEGRATED STEEL MILL
11. STEEL MAKING PLANT OF INTEGRATED STEEL MILL
12. CONTINUOUS CASTER PLANT OF INTEGRATED STEEL MILL
13. COKE OVEN PLANT & GAS TREATMENT PLANT
14. BOREHOLE TEST OF INTEGRATED STEEL MILL
15. SITE OFFICE OF INTEGRATED STEEL MILL JV
16. SINTER PLANT OF INTEGRATED STEEL MILL
17. SINTER PLANT OF INTEGRATED STEEL MILL
18. BLAST FURNACE OF INTEGRATED STEEL MILL
19. BLAST FURNACE OF INTEGRATED STEEL MILL
20. PILE LOAD TEST OF INTEGRATED STEEL MILL
21. FINAL WASTE WATER TREATMENT & REUSING SYSTEM
22. FINAL WASTE TREATMENT & REUSING SYSTEM
23. SOFT SOIL IMPROVEMENT WORK OF INTEGRATED STEEL MILL KS
POSCO
24. CIVIL & ARCHITECTURAL DESIGN ANDENGINEERING SERVICES
25. SLAG TREATMENT AND SLUDGE & DUST MIXING EQUIPMENT
26. SLAG TREATMENT AND SLUDGE & DUST MIXING EQUIPMENT
27. ANALYSIS LABORATORY FACILITY
28. PLATE MILL IF INTEGRATED STEEL MILL
29. CONTINUOUS CASTER PLANT OF INTEGRATED STEEL MILL
30. STEEL MAKING PLANT OF INTEGRATED STEEL MILL
31. COKE OVEN PLANT OF INTEGRATED STEEL MILL
32. CENTRAL MAINTENANCE HANDLING FACILITY
Scope of Work
EPC
PEMBANGUNAN HOTEL 5 (LIMA) LANTAI HOTEL PERMATA KRAKATAU
Client | : | PT KRAKATAU INDUSTRIAL ESTATE CILECON (KIEC) |
Location | : | Cilegon |
Period | : | 2010 |
Outline of Project
New 4 Star hotel, 6159 m2 hotel building (5 floor) consist of 5 vip room, 29 double bed room, 45 twin bed room and other facilities includes grand lobby , 4 meeting room, restaurant.
Scope of Work
Engineering, Procurement & Construction for Structure, architecture, Mechanical, Electrical, Building Equipment, Interior , Furniture, Gardening and Landscaping